Li Yunlong Was Reborn and Led an Expedition to Changjin Lake at the Beginning.

重生李云龙,开局率军远征长津湖

by The Money Rabbit Is Like Brocade and the Rabbit Is Showing Off (钱兔似锦大展鸿兔)

Status
Completed
Length
1.1M Words
Genre
Urban
Audience
Male
Updated
7mo ago
Source
Fanqie
Request a translation

Stats

24.6kReads
8.2Score
1.8kShelves
506Chapters
5kListens
1.3MReads · all time

Tags

Synopsis

Reader comments

  1. 17 likes
  2. 10 likes
  3. 5 likes
  4. 5 likes
  5. 5 likes
  6. 5 likes
  7. 5 likes
  8. 5 likes
  9. 4 likes
  10. 4 likes
  11. 4 likes
  12. 4 likes
  13. 4 likes
  14. 3 likes
  15. 3 likes
  16. 3 likes
  17. 3 likes
  18. 3 likes
  19. 3 likes
  20. 3 likes
  21. 3 likes
  22. 2 likes
  23. 2 likes
  24. 2 likes
  25. 2 likes
  26. 2 likes
  27. 2 likes
  28. 2 likes
  29. 2 likes
  30. 2 likes

In booklists 50

Explore more →

Novels About Volunteers Fighting Against U. S. Aggression and Aiding Korea

71.7MViews249Books3dUpdated

Looking for Hardcore Popular Books That Are Being Read by More Than 400,000 People!

The aroma of wine is not afraid of deep alleys! A good book is not afraid that no one will read it! I finally found a rule again: the more people are reading it, the more interesting the novel will be! Bookworms, please take out your bags!

70.1MViews435Books9hUpdated

A Reliable Novel That Time Travels to Liangjian

Don't be too exaggerated and mindless

56.2MViews335Books3dUpdated

Is There Any Li Yunlong Who Wrote After the Founding of the People's Republic of China?

37.3MViews220Books4dUpdated

Through Liangjian, the Position Is Higher Than That of the Regiment Commander, Such as Brigade Commander, Division Commander, Army Commander...

@Tomatonovel team

37.2MViews292Books3dUpdated

The protagonist crosses Changjin Lake and starts with a sniper. The protagonist's name is Ye Feng.

37MViews381Books5dUpdated

Travel Through the Red Army Period to the End of the Anti-Japanese War to Promote the Construction of New China

27.1MViews474Books2dUpdated

A Novel About Resisting U. S. Aggression and Aiding Korea, with a System

Tribute to the cutest man!

26.9MViews328Books10dUpdated

Looking for a Journey Through the Red Army's Long March to After Liberation

21.4MViews176Books8dUpdated

Reborn in 1990, Commander

19.1MViews144Books4moUpdated

Please Take the Troops Back to the Anti-Japanese War Period to Help Our Ancestors

18.5MViews286Books4dUpdated

You Can't Find Someone Who Has a Crooked Butt and Carries Private Goods If You Show Your Swordsmanship.

16MViews266Books3dUpdated

"Chinese Super Genius Almighty Medical Doctor"

I want to watch content similar to "Chinese Super Genius Almighty Medical Doctor".

14.1MViews593Books3dUpdated

I, Li Yunlong, Are in Such a Short Supply of Books. If I Recommend Two Books, I Will Win Ping'an County.

12.4MViews270Books11dUpdated

Through Liangjian, the Position Is Higher Than the Regimental Commander, Such as Brigade Commander, Division Commander, Army Commander...

12.1MViews322Books2dUpdated

Bright Sword: Become a God in the First Battle in Taiyuan, and Be Promoted to Brigade Commander!

Want to watch something similar to "Bright Sword: Become a God in the Battle of Taiyuan, and be promoted to brigade commander!" Book. Chapter 3 A wave of defense? No, give it a try! Soon, everyone was armed and light machine guns were mounted. A battalion of more than 200 people actually has more than a dozen light machine guns and three guns

11.8MViews256Books20dUpdated

A Novel That Travels Back to Liangjian

A novel that travels back to Liangjian, superhuman series is not necessary

11.7MViews113Books9dUpdated

Please Join the Army, No Heroine, but a System! !

11.4MViews230Books20dUpdated

Tomato's Best Anti-War Novels

I would like to read a book similar to "The War of Resistance: Ballistic Traceless". He looks like he's fascinated, and his blood is boiling

11.2MViews333Books1dUpdated

Travel Through the Red Army Period to the End of the Anti-Japanese War to Promote the Construction of New China

11.1MViews307Books3dUpdated

Books Whose Souls Are Pierced Through the Bodies of Soldiers Who Resisted U. S. Aggression and Aided Korea and Made Great Military Exploits.

I would like to read a book similar to "Volunteers: Peak Infantry, All-Front Assault".

11.1MViews167Books1dUpdated

The Protagonist of Bright Sword Has a Large Amount of Materials to Trade with Li Yunlong.

The protagonist makes a deal with Li Yunlong, but does not directly participate in the battle. The author is particularly careful to include the combat terrain area in the text. There seem to be some very powerful people around the protagonist, and they have something to do with poison gas.

11MViews293Books4dUpdated

Are There Any Forces Developed from the Republic of China That Have Survived into Modern Times?

I want to read a book like "Tomb Robbers: Building an Immortal Family from the Republic of China".

10.5MViews330Books8dUpdated

Overseas Nation-Building Novels

Looking for a novel about the founding of the country overseas?

9.8MViews352Books6dUpdated