Learn content related to railway power supply system**
1. For operations that require a power outage from the catenary network, blindly start operations or mistakenly board live poles and electrical equipment when there is no power outage. 2. It is strictly prohibited to stop power supply without any construction plan, work ticket or dispatching order, and it is not allowed to operate beyond the ground wire protection range. 3. It is strictly prohibited to stop or power on without confirming the conditions for stopping or powering on, or stopping or powering on by mistake. 4. The operator of the isolating switch in the loading yard did not perform the operating procedures of the isolating switch. 5. The isolating switch was operated without completing the operating procedures as required, and the measures for power outage, power inspection, and grounding and line sealing were not implemented during the operation. 6. When high-voltage equipment is powered off, all switches that may receive power are not disconnected or grounding wires are not installed.
This novel and its characters are purely fictitious. Any similarity is purely coincidental and should not be imitated.