Thanks for Poker, Thanks for the People Who Play Poker with Me

Thanks for Poker, Thanks for the People Who Play Poker with Me

by Zhu Wen

Length:
20Kwords
Activity:
Updated 7y agoScraped 18d ago
4Favorites
3Fans
0QD Score

About This Novel

New Year's Day has passed and the new year has arrived, and the progress of the project has indeed become smoother. A very eye-catching countdown sign was erected at the entrance of the factory. There are still 200 days until Unit 1 is connected to the grid to generate electricity. Unit 2 will also be put into operation by the end of the year as planned. The installed capacity of these two units is 300,000 kilowatts, with a total installed capacity of 600,000 kilowatts. They use lean coal from the Changzhi Mine in Shanxi Province. This power station will play a very important role in alleviating the shortage of electricity in the East China power grid, especially in the local residents. At the unveiling ceremony, the factory director certainly had to make a speech without hesitation.

What Readers Think

Rating

Good0%Neutral0%Bad0%

Community(0)

You Might Also Like